Aakhir Tak – In Shorts:
- HAL has assured the Air Force of Tejas Mk1A jet deliveries after the Air Force Chief’s “no confidence” remark.
- The delay in delivery was due to technical issues, not “laziness,” according to HAL.
- The Air Force is awaiting 83 Tejas Mk1A jets, which are crucial for upgrading the force’s combat capability.
- HAL will deliver three aircraft to the Air Force by the end of this year.
- The complete delivery of all 83 LCA Mk1A jets is expected within the next three and a half years.
Aakhir Tak – In Depth:
Following delays by Hindustan Aeronautics Limited (HAL) in delivering the Tejas Mk1A fighter jets to the Indian Air Force, the public sector defense manufacturer has assured that it will soon begin deliveries to the Indian Air Force. HAL stated that the delay was not due to “laziness” but rather technical difficulties, which have now been resolved. HAL’s comments came a day after the Air Force Chief said that he had “no confidence” in the aerospace company. The Air Force is awaiting 83 Tejas Jet Mk1A, the Light Combat Aircraft (LCA), ordered in 2021, which are crucial for upgrading the force’s combat capability.
The discussion on the delay and the Air Force’s dissatisfaction came to the fore amid the biennial Aero India show in Bengaluru. HAL Chairman and Managing Director DK Sunil said that the delay is “not simply attributable to just, I would say, laziness on the part of the industry” and added that there have been technical issues, which have now been resolved. “The concern of the Air Chief is understandable,” he said. One aircraft from HAL’s Nasik facility and two from Bengaluru will be delivered to the Air Force by the end of this year. Sunil confirmed that the complete delivery of all 83 LCA Mk1A jets, as per the existing contract with the Air Force, is expected to be completed within the next three and a half years. This ambitious timeline aims to rectify previous delays and meet the IAF’s operational requirements.
“We have now promised that we will have all the structures ready. We have conveyed this. We have had multiple meetings at different levels. We have conveyed this. We are building this. And once the engines are available, this will start rolling out. I think the concern is well understood. There is no doubt on that and as a team, all of us are focused…we will start delivering the aircraft,” the HAL head said. The Air Force, however, is still awaiting delivery of four out of the 40 Tejas Mk1 jets, the predecessor of the Mk1A, which were ordered in 2010. This pending delivery highlights the continuing challenges in fulfilling past commitments.
Sunil pointed out that the United States is set to deliver 12 GE-404 engines to the company this year, and discussions are progressing on the advanced GE-414 engine deal, which is expected to play a critical role in India’s fighter jet programs. He expressed hope that Prime Minister Narendra Modi’s visit to the US is likely to fast-track the deliveries. Industry analysts suggest that the success of the HAL program is crucial for India’s self-reliance in defense. Indian Air Force modernisation hinges on these timely deliveries.
Aakhir Tak – Key Takeaways to Remember:
HAL has assured Tejas Jet Mk1A delivery to the Air Force following “no confidence” remarks. Technical issues, not laziness, caused the delays. The Air Force awaits 83 Tejas Jet Mk1A to boost combat capability. Three aircraft will be delivered by year-end, with complete delivery expected in three and a half years.
Discover more from Latest News, Breaking News, National News, World News
Subscribe to get the latest posts sent to your email.